Site Reconnaissance: The process of conducting site visits and inspections before the project to examine and determine the work to be done in detail.
Preparation of Facility Specification: The stage of creating a document containing detailed facility features and requirements in accordance with the requirements of the project.
Determination of Project and Material Details: The stage of determining the characteristics of the facility where the project will be carried out and the materials to be used.
LNG and Cryogenic Facilities Field Installations: Field installations of liquefied natural gas or low temperature systems, especially cryogenic systems.
Tank Site Construction: The process of preparing the area where the storage tanks will be placed and performing the installation of the tanks.
Equipment Site Placement: The location and placement process in which the equipment required for the facility is determined.
Field Assembly Procedures: The stage of assembling the structures, equipment or systems required for the facility in the field.
Control Panel Installation (Safety, Emergency, etc.): The installation phase of the control panels required for the security of the facility, especially the installation of panels designed for emergencies.
Field Final Tests: The process of evaluating the functionality and performance of the facility through field tests following the assembly and installation process of the facility.
LNG and Cryogenic Facilities Commissioning: The process of testing the functionality of liquefied natural gas or low temperature systems and putting them into operation.
CNG Applications: The process of designing, installing or operating application areas where compressed natural gas (CNG) is used.